Please login or register.

Login with username, password and session length

Author Topic: The Holyhead Road, Vol 2  (Read 69 times)

0 Members and 1 Guest are viewing this topic.

Offline Jean

  • Not very Welsh dragon
  • Administrator
  • *
  • Posts: 4995
The Holyhead Road, Vol 2
« on: Friday 08 February 2019, 0926 »
www.gutenberg.org/ebooks/58841

The surroundings of the town itself are described in Ch. LIX.

(See also Vol 1.)

Offline Trefignath

  • Dignified Elderly and Venerated Oldie
  • Administrator
  • *
  • Posts: 17239
  • Back Again.
Re: The Holyhead Road, Vol 2
« Reply #1 on: Wednesday 20 February 2019, 2052 »
Quote
As a business speculation, if it had been built solely to that end, the Menai Bridge would be pronounced a failure, for the interest on capital originally expended comes, at five per cent., to 6,000 per annum, and the annual income from tolls, returned in 1837 as 1,200, when the coaches were still running, must now be less rather than more. In addition to the original cost, the charge for upkeep must be taken into consideration, although, as the ironwork has not been painted for many years past, that, perhaps, does not bulk very largely.

Shades of HS2 methinks :-)

Thanks for the links Jean. I have tagged them for reading later.
Not waiting for the others.